Noise Alert: Loud deliveries on 4th floor Monday, Sept. 8
Monday, Sept. 8, a large quantity of materials will be moving from the 1st floor loading dock to the 4th floor. This activity is scheduled for 7 to 10 a.m. The path will go into the silent area of the 4th floor.
Expect ongoing noise on the 4th floor for the next two months. New shelving is being installed for the expanded Special Collections and Archives department.
Free earplugs are available at the Information Services Desk.
A portion of the 3rd floor is now designated as a silent study area.
Categories Noise