In the News
Mentions of VCU Libraries building plans: VCU Library Ready to Turn Page – Richmond Times-Dispatch The Washington Post Washington Times NBC 12 (Richmond) FOX 5 (DC) KSL TV (Utah) ABC 8 (Richmond)
Noise Alert: Week of March 24, expect noisy drilling, mostly 2 a.m. to 7 a.m.
Noise alert, week of March 24: There will be some electrical work on the north side of the freight elevator in order to install panels to feed power to the new offices and later this summer to new space. This work will require noisy core drilling, which will be done between 2 a.m. and 7 […]
New doors open at Cabell and they signal the start of something big.
Three signs that the new library on Monroe Park Campus is on the way: 1. New walkway 2. New entrance that will be in use until the new library, with its Grand Entrance on The Compass opens in 2015 3. Information Services desk location is in the center of the first floor. Walk straight ahead […]
Schedule Update: New entrance opens Friday, March 21
The temporary Cabell Library entrance will open Friday, March 21. Entrance will be in use throughout the construction process, through fall 2015. Other construction updates: Thursday, March 20, there will be activity at the current entrance and the temporary entrance as a variety of things are relocated: traffic counter, 3M gates, air curtain, and the […]
Ear Plugs available at service desk
Can’t hear yourself think? Get free earplugs at the Information Services Desk.