Construction has shifted some books and materials.

Over winter break, temporary  construction walls went up on the third and fourth floors.

Oversized books from the fourth floor will be found on the third floor north wall area.

Looking for music scores? They are all on the third floor, north walls area. A construction wall installed during winter break cut off access to the first row of Music Scores, covering M6 – M24. But, they’ve been safely moved.

The construction walls will be coming down in March or April and we’ll move things back the way they were then.

Categories Update