Monday, expect significant construction activity at the first floor doorway to the stairwell located on the north side of the building, behind the freight elevator.

Regular use of the stairway will not be possible beginning Monday.

Egress at that place in the building will change from a stairwell to a tunnel, which will only be used by patrons for emergency exiting. For non-emergency use, that staircase can only be used to travel between second, third and fourth floors. Access to the lower level will be via the stairs near Starbucks, the south staircase and the elevators.

Categories Update