June 30: Loading dock change will bring deliveries traffic into first floor
On Monday, June 30, the Cabell Library loading dock will close. Deliveries will come into the building’s first floor via a temporary loading dock located on Linden Street.
The corridor on the north side of the building–from the double doors beyond the rest rooms and up to the service/freight elevator–will become much busier. Deliveries of equipment, for Starbucks and more will cross paths with staff and students entering and exiting the restrooms.
Categories Update