Starting Sept. 4 and continuing off and on for two months, there will be noise on the 4th and 3rd floors from 4 a.m. to 8 a.m. (Monday-Friday). Work crews will be drilling into the 4th floor slab to install rails for the compact shelving.

The drilling is limited to these hours to minimize the disruption to students.

Categories Noise, Update