Construction on Tompkins-McCaw first floor begins Dec. 16
Tompkins-McCaw Library for the Health Sciences is getting a facelift. The first floor will get new carpet, furniture and a new information service desk.
Construction is scheduled to start Dec. 16 with the most disruptive work taking place over the winter break to minimize inconvenience to faculty, staff and students.
But, be prepared for noise and disruption through January 2017.
The library will remain open during its regularly scheduled hours. While some sections of the first floor will be closed, other study spaces on the second floor and lower level offer alternatives.
Noise alerts and updates will be posted to the home page.
Categories Noise