Starting June 9, W. M. Jordan is beginning to replace the Variable Air Volume (VAV) heating/air conditioning units on the third floor. To do this work, the heating water supply will be shut off. This will create “cold spots” where patrons may feel cold air.

This process, which requires installation of 19 units (two per day) after the piping is ready (seven to eight working days) should be complete by early July.

Categories Uncategorized, Update